12 lines
2.1 KiB
Markdown
12 lines
2.1 KiB
Markdown
# CreatePlanRolloverResponse
|
|
|
|
Rollover configuration for unused units. If set, unused included units roll over to the next period.
|
|
|
|
|
|
## Fields
|
|
|
|
| Field | Type | Required | Description |
|
|
| ------------------------------------------------------------------------------------------------ | ------------------------------------------------------------------------------------------------ | ------------------------------------------------------------------------------------------------ | ------------------------------------------------------------------------------------------------ |
|
|
| `max` | *Nullable[float]* | :heavy_check_mark: | Maximum rollover units. Null for unlimited rollover. |
|
|
| `expiry_duration_type` | [models.CreatePlanExpiryDurationTypeResponse](../models/createplanexpirydurationtyperesponse.md) | :heavy_check_mark: | When rolled over units expire. |
|
|
| `expiry_duration_length` | *Optional[float]* | :heavy_minus_sign: | Number of periods before expiry. | |